Sometimes it's just an out of the box idea!!!

    • Acknowledgement and Appreciation: The Beaver Dam Repair Project Lake Association sent a letter expressing their sincere appreciation for the efforts to save their lake. They stated that they would likely be looking at a mud pit for the next several years without the team’s work.
    • Resolution of the Problem: The letter explicitly mentions the installation of a permanent riser pipe, which replaced the old pipe with a failing gate valve. As a result of this, the lake is now permanently sealed, and they are no longer in danger of “losing our lake”. This directly addresses the problem which shows a degraded structure near the water’s edge, suggesting potential issues with water levels.
    • Positive Outcomes: The Lake Association noted that the efforts and results delivered by the project were accomplished without them having to lower the lake level. This indicates a successful and efficient execution of the project.
    • Direct Statement of Success: The “Beaver Dam Project” page itself concludes with a bold “Success!!” after depicting various stages of what appears to be the construction or repair process involving a screen and riser pipe.

The Lake Association specifically commends Robby’s team, including Danny and Terry, for their superb efforts over several years. They also acknowledge the contributions of individuals within their own association who met with the project team and commented on their professionalism and competency.